Status Update on the ISAC Control System

dc.creatorKeitel, R.
dc.creatorBishop, D.
dc.creatorDale, D.
dc.creatorHui, H.
dc.creatorKadantsev, S.
dc.creatorLeross, M.
dc.creatorNussbaumer, R.
dc.creatorRichards, J.
dc.creatorTikhomolov, E.
dc.creatorWaters, G.
dc.date2001-11-09
dc.date.accessioned2026-07-07T05:46:36Z
dc.date.available2026-07-07T05:46:36Z
dc.descriptionImplementation and commissioning of the EPICS based control system for the ISAC radioactive beam facility was completed. The target ion source, mass separator, and low-energy beam-lines started beam production for experiments. In parallel, controls for the accelerator system, a radio-frequency quadrupole followed by a drift-tube linac, and several high-energy beam-lines were implemented and commissioned. The number of controlled devices more than doubled since the last report. An overview of relational database usage, software engineering and quality control methods used will be given.
dc.descriptionICALEPCS01 TUAPO28
dc.identifierhttps://arxiv.org/abs/physics/0111095
dc.identifierhttp://arxiv.org/abs/physics/0111095
dc.identifiereConf C011127 (2001) TUAP028
dc.identifier.urihttp://salesiana.dossiersoluciones.com/handle/123456789/84396
dc.subjectAccelerator Physics
dc.titleStatus Update on the ISAC Control System
dc.typetext

Files

Collections