A Control System of the Joint-Project Accelerator Complex

dc.creatorChiba, J.
dc.creatorFujii, H.
dc.creatorFurukawa, K.
dc.creatorKamikubota, N.
dc.creatorNakagawa, H.
dc.creatorYamamoto, N.
dc.creatorSakaki, H.
dc.creatorYoshikawa, H.
dc.date2001-11-28
dc.date.accessioned2026-07-07T05:46:46Z
dc.date.available2026-07-07T05:46:46Z
dc.descriptionThe current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac.
dc.description3 pages, no figure, ICALEPCS01
dc.identifierhttps://arxiv.org/abs/physics/0111202
dc.identifierhttp://arxiv.org/abs/physics/0111202
dc.identifiereConf C011127 (2001) TUAP002
dc.identifier.urihttp://salesiana.dossiersoluciones.com/handle/123456789/84462
dc.subjectAccelerator Physics
dc.titleA Control System of the Joint-Project Accelerator Complex
dc.typetext