A Control System of the Joint-Project Accelerator Complex
| dc.creator | Chiba, J. | |
| dc.creator | Fujii, H. | |
| dc.creator | Furukawa, K. | |
| dc.creator | Kamikubota, N. | |
| dc.creator | Nakagawa, H. | |
| dc.creator | Yamamoto, N. | |
| dc.creator | Sakaki, H. | |
| dc.creator | Yoshikawa, H. | |
| dc.date | 2001-11-28 | |
| dc.date.accessioned | 2026-07-07T05:46:46Z | |
| dc.date.available | 2026-07-07T05:46:46Z | |
| dc.description | The current status of the control system for a new high intensity proton accelerator, the JAERI-KEK Joint Project, is presented. The Phase 1 of the Joint-Project has been approved and recently started its construction at JAERI site at Tokai. The first beam commissioning is scheduled in 2006. In parallel with it, a 60-MeV Linac is now being constructed at KEK site at Tsukuba for R&D purpose. Recently the Project has officially decided to use the Experimental Physics and Industrial Control System (EPICS). Under the EPICS environment, we are challenging to implement the Ethernet/IP network for all communication, even at the level of end-point controllers which are so far connected via a field bus. In order to realize such a system, three new controllers (PLCs, WE7000 stations and general-purpose Ethernet boards) are being developed. A prototype EPICS driver for the PLCs works fine and is used to control the ion-source at the KEK Linac. | |
| dc.description | 3 pages, no figure, ICALEPCS01 | |
| dc.identifier | https://arxiv.org/abs/physics/0111202 | |
| dc.identifier | http://arxiv.org/abs/physics/0111202 | |
| dc.identifier | eConf C011127 (2001) TUAP002 | |
| dc.identifier.uri | http://salesiana.dossiersoluciones.com/handle/123456789/84462 | |
| dc.subject | Accelerator Physics | |
| dc.title | A Control System of the Joint-Project Accelerator Complex | |
| dc.type | text |