U-70 Proton Synchrotron Extracted Beam Lines Control System Modernization

dc.creatorAlferov, V.
dc.creatorBordanovski, Y.
dc.creatorKlimov, S.
dc.creatorIlukin, V.
dc.creatorKuznetsov, V.
dc.creatorRadin, O.
dc.creatorShalunov, A.
dc.creatorSytin, A.
dc.creatorVetrov, P.
dc.creatorYaryguine, V.
dc.creatorZapolsky, V.
dc.creatorZarucheisky, V.
dc.date2001-11-07
dc.date.accessioned2026-07-07T03:45:46Z
dc.date.available2026-07-07T03:45:46Z
dc.descriptionA 70 GeV Proton Synchrotron Extracted Beam Lines Control System is described. About 130 Magnet Dipoles and Quadrupoles, 20 Correction Magnets, 50 Beam Collimators, BPM equipment spread over 1 Km have to be controlled. The old System was based on the PDP-11/40 and LSI-11 compatible computers and the MIL 1553 STD as a Field Bus. It successfully operated about 15 years. A new system includes home made Equipment Controllers based on I 8051 Processors, CAN Field Bus, FECs, Servers, Consoles connected by Ethernet. On the first stage of modernization PDPs and LSIs are replaced with PCs connected by Ethernet. Equipment controllers are being successfully tested in the Collimators and Corrector Magnets Controls during a run.
dc.description3 pages, 2 figures, International Conference on Accelerator and Large Experimental Physics Control Systems San Jose, California, November 27-30, 2001
dc.identifierhttps://arxiv.org/abs/hep-ph/0111079
dc.identifierhttp://arxiv.org/abs/hep-ph/0111079
dc.identifiereConf C011127 (2001) WEAP026
dc.identifier.urihttp://salesiana.dossiersoluciones.com/handle/123456789/41044
dc.subjectHigh Energy Physics - Phenomenology
dc.titleU-70 Proton Synchrotron Extracted Beam Lines Control System Modernization
dc.typetext

Files

Collections