The Advanced Light Source Accelerator Control System at Ten Years from Commissioning

dc.creatorBiocca, A.
dc.creatorBrown, W.
dc.creatorDomning, E.
dc.creatorFowler, K.
dc.creatorJacobson, S.
dc.creatorMcDonald, J.
dc.creatorMolinari, P.
dc.creatorRobb, A.
dc.creatorShalz, L.
dc.creatorSpring, J.
dc.creatorTimossi, C.
dc.date2001-11-28
dc.date.accessioned2026-07-07T05:46:46Z
dc.date.available2026-07-07T05:46:46Z
dc.descriptionThe Advanced Light Source was commissioned 10 years ago using the newly constructed control system. Further experience with the control system was reported in 1993. In this publication, we report on recent experience with the operation and especially growth of the computer control system and expansion to accommodate the new superconducting bend magnets and fast orbit feedback for the ALS electron storage ring.
dc.descriptionPoster at ICALEPCS 2001, PSN TUAP008, 3 pages, no figures
dc.identifierhttps://arxiv.org/abs/physics/0111201
dc.identifierhttp://arxiv.org/abs/physics/0111201
dc.identifiereConf C011127 (2001) TUAP008
dc.identifier.urihttp://salesiana.dossiersoluciones.com/handle/123456789/84461
dc.subjectAccelerator Physics
dc.titleThe Advanced Light Source Accelerator Control System at Ten Years from Commissioning
dc.typetext

Files

Collections