Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection
| dc.creator | Zwaska, R. | |
| dc.creator | Kopp, S. | |
| dc.creator | Pellico, W. | |
| dc.creator | Webber, R. | |
| dc.date | 2004-07-01 | |
| dc.date.accessioned | 2026-07-07T05:52:11Z | |
| dc.date.available | 2026-07-07T05:52:11Z | |
| dc.description | To date, the 120 GeV Fermilab Main Injector accelerator has accelerated a single batch of protons from the 8 GeV rapid-cycling Booster synchrotron for production of antiprotons for Run II. In the future, the Main Injector must accelerate 6 or more Booster batches simultaneously; the first will be extracted to the antiproton source, while the remaining are extracted for the NuMI/MINOS (Neutrinos at the Main Injector / Main Injector Neutrino Oscillation Search) neutrino experiment. Performing this multi-batch operation while avoiding unacceptable radioactivation of the beamlines requires a previously unnecessary synchronization between the accelerators. We describe a mechanism and present results of advancing or retarding the longitudinal progress of the Booster beam by active feedback radial manipulation of the beam during the acceleration period. | |
| dc.description | Contributed to EPAC 2004; Lucerne, Switzerland | |
| dc.identifier | https://arxiv.org/abs/physics/0407007 | |
| dc.identifier | http://arxiv.org/abs/physics/0407007 | |
| dc.identifier.uri | http://salesiana.dossiersoluciones.com/handle/123456789/86241 | |
| dc.subject | Accelerator Physics | |
| dc.title | Synchronization of the Fermilab Booster and Main Injector for Multiple Batch Injection | |
| dc.type | text |