IHEP Experience on Creation and Operation of RFQS
Loading...
Date
Journal Title
Journal ISSN
Volume Title
Publisher
Abstract
Description
The new 1.8 MeV proton RFQ was completed and started operation in the IHEP in 1997. It was built according to the plan of modernization of the injection system to the booster of the IHEP proton synchrotron.
3 pages, 7 figures, LINAC2000 Conference, PDF format
3 pages, 7 figures, LINAC2000 Conference, PDF format