2026-07-072026-07-07http://salesiana.dossiersoluciones.com/handle/123456789/37704Run II of the Tevatron Collider is reviewed, emphasizing operations through March 15, 2004. The Run II Luminosity Upgrade plans and luminosity projections through 2009 are discussed.8 pages - including 4 figures and 1 photograph to be published in proceedings of XXXIXth Rencontre de Moriond conference on ElectroWeak Interactions and Unified Theories, La Thuile, Aosta Valley, Italy, March 21-28, 2004High Energy Physics - ExperimentTevatron Collider Operations and Planstext