Interconnect Challenges in Highly Integrated MEMS/ASIC Subsystems

dc.creatorMarenco, N.
dc.creatorWarnat, S.
dc.creatorReinert, W.
dc.date2008-02-21
dc.date.accessioned2026-07-07T09:22:28Z
dc.date.available2026-07-07T09:22:28Z
dc.descriptionMicromechanical devices like accelerometers or rotation sensors form an increasing segment beneath the devices supplying the consumer market. A hybrid integration approach to build smart sensor clusters for the precise detection of movements in all spatial dimensions requires a large toolbox of interconnect technologies, each with its own constraints regarding the total process integration. Specific challenges described in this paper are post-CMOS feedthroughs, front-to-front die contact arrays, vacuum-compliant lateral interconnect and fine-pitch solder balling to finally form a Chip-Scale System-in-Package (CSSiP).
dc.descriptionSubmitted on behalf of EDA Publishing Association (http://irevues.inist.fr/EDA-Publishing)
dc.identifierhttps://arxiv.org/abs/0802.3095
dc.identifierhttp://arxiv.org/abs/0802.3095
dc.identifierDans Symposium on Design, Test, Integration and Packaging of MEMS/MOEMS - DTIP 2007, Stresa, lago Maggiore : Italie (2007)
dc.identifier.urihttp://salesiana.dossiersoluciones.com/handle/123456789/155382
dc.subjectOther Computer Science
dc.titleInterconnect Challenges in Highly Integrated MEMS/ASIC Subsystems
dc.typetext

Files

Collections